Click Here->:
Get Latest Price
On November 3, 2016, Coldstream Concrete Ltd. supplied the second half of this three-sided open-bottom culvert to the town of Aylmer, Ontario. The culvert spans 6.0 metres wide and is a low earth cover design. Due to existing hydro conduits three of the culvert pieces had to be skated into position after they were lowered into the excavation.
MINING Heavy Industries Co., Ltd. China(Mainland)
Copyright © 2020 HOSTPRO CRUSHING MACHINERY all rights reserved. Sitemap